WE CAN HELP YOU!
RENEWABLE WATER SOLUTIONS FOR EVERY HOME IN CYPRUS
Residential wastewater
treatment plants
Aquatec AT6 - AT20
ProtoAqua offer a full turn-key installation service, AT6 - AT20 residential wastewater treatment plants were invented to purify sewage water for detached houses.
Wastewater treatment plants of the AT6 to AT20 series are solutions and bring benefits for every household:
- Clean water directly at source of pollution
- Low operating costs of wastewater treatment unit
- Operation up to 8 times cheaper compared to the cesspool
- High quality purified water
- Reuse of purified water
- Quiet, odorless
- Meets the prescribed EN 12566-3 standard

Simple installation of
AT wastewater treatment plants
WWTPs of the type AT 6 to AT 20 are installed into a pit with a 15 cm thick reinforced concrete slab on the bottom, so that the upper edge of the WWTP tank overlaps about 5 cm above the terrain. If necessary, and if the design documentation requires it, the WWTP is to be concreted to the height specified by the project documentation. WWTP must be filled with water (to the outflow pipe level) before doing the backfill. Detailed instructions for installing of WWTPs are given in the operating instructions annexed. The ProtoAqua VFL technical team will take care of the installation.

Guaranteed values of Aquatec VFL wasterwater treatment plants
For the long lifetime of each process equipment, it is necessary to provide professional service. We therefore provide wastewater treatment plants maintenance and service throughout Cyprus:
Warranty service of wastewater treatment plants
Post-warranty service of wastewater treatment plants
Regular prepaid service of wastewater treatment plants
Emergency service of wastewater treatment plants
Aquatec VFL wastewater treatment plants, manufactured first in Slovakia, obtained the Eurocertificate based on the long-term testing of treatment efficiency in compliance with EN 12566-3, which was carried out by PIA GmbH in Aachen, Germany.
The Eurocertificate was the first to finally investigate whether a residential wastewater treatment plant purifies water. Our wastewater treatment plant achieved great results in the test, which is proven by the evaluation.
In the countries of the European Union, only those wastewater treatment plants certified in compliance with the norm EN 12566-3, and whose purification efficiency satisfies the national legislation of a particular country, may be installed.
Our wastewater treatment plants provide the highest quality of workmanship to thousands of satisfied customers all over the world.
As of today, our wastewater treatment plants produce a total of approximately 5 million litres of purified water per day.

- Dig a hole
- Build a reinforced-concrete base slab 150 mm thick, flatness +/- 5 mm;
- Create furrows that are directed to the excavation centre for the inlet and outlet piping;
- Lay the pipelines;
- The pipelines should be lead to the excavation in its appropriate length;
- Prepare the inlet piping to be directly connected to the input socket of the wwtp
- The outlet piping in the excavation should end with a socket to allow its connection with the outlet piping from the wwtp;
- Unless the pipelines are led to the hole on the same axis (e.g. due to technical terms), a sufficient number of interconnecting elbow-pipes with the correct angles should be provided on the day of installation
- Decreasing the level of the underground water below the excavation base level;
- Reinspect the flatness of the reinforced-concrete base slab (permitted tolerance +/- 5 mm in all directions). If the flatness is not within the aforementioned tolerance, place the cement layer to achieve the required flatness;
- Make certain there are no objects, stones, clay etc. on the reinforced-concrete base slab;
- Lay the protective PP or PVC of DN 50 piping below the ground level so the air supply flow from the blower to the wwtp;
(the pipeline serves for the connection hose to pass through which will secure the air blowing from the blower to the wwtp; it should not be more than 5 metres long); - Leading the electric power to the blower location, placing the electric cable into the protective piping according to the applicable Slovak Technical Norms (STN));

2 – Oxic chamber
3 – Final clarification chamber
4 – Integrated retention chamber
5 – Internal recirculation
6 – Recirculation of sludge
7 – Fine-bubble diffusor
8 – Flow regulator
The technology Vertical Flow Labyrinth – VFL®, used in the biological reactor, is protected internationally by patent. The purification technology ensures the high quality of purified water, low investment and operation costs.
European Union
The AT wastewater treatment plant meet the requirements for the resistance of inflowing sewage water abruptly. Ensuring the homogeneous operation of the wastewater treatment plant in the event of abrupt outpour of high volume of water (e.g. bathtub, washing machine, etc.). The wastewater treatment plant main problem is respect to the discharge of the activated sludge upon every abrupt inflow resulting in solving this issue.







CALL US TODAY
+35799645361, +35795500095
email:info@protocrypt.com
Technical parameters